INDIA'S largest thermal power producer NTPC is recruiting
120 engineering executive trainees in the disciplines of electrical (40),
mechanical (60), electronics (10) and instrumentation (10) for its
projects/stations through gate-2015 scores.
The last date for online registration is March 3.
NTPC is the largest power utility...
in India with an installed
power capacity of 43,143 MW and an additional 23839 MW capacity under
construction. To realize the vision of becoming a world class power major, NTPC
plans to become a 1,28,000 MW company by 2032. To fuel its ambitious growth
plan, the Maharatna company is looking for promising, young and dynamic
Graduate Engineers with brilliant academic record to join the organisatiion.
Pay Package: NTPC offers one of the best pay packages in the
industry. The selected candidates will be placed in the pay scale of Rs 24,900-3%-50,000
at the basic pay of Rs 24,000 during one year training. These candidates will
be absorbed after successful completion of training as assistant managers in
the pay scale of Rs 24,900-3%-50,000 at the basic pay of Rs 25650. They will
also be given DA and other allowances.
The selected candidates will undergo training for one year
at various places. The final place of posting will be decided after the
completion of training based on performance and requirement.
Key dates:
GATE 2015 Online Examination Dates: January 31,
2015 till Feb 8, 2015
Commencement of online registration of application by NTPC
candidates: Feb 2, 2015
Last date of online registration of application by NTPC
candidates: March 3, 2015 (midnight).
For details log on to ntpccareers.net.
No comments:
Post a Comment