NATIONAL Thermal Power Corporation (NTPC) invited applications for the post of Executive Trainee in the disciplines of Electrical, Mechanical, Electronics, Instrumentation, Civil and Computer Science & Information Technology through GATE 2016. The candidates eligible for the post can apply through online on or before 01 October 2016. NTPC is India’s...
largest energy conglomerate with roots planted way back in 1975 to accelerate power development in India. Since then it has established itself as the dominant power major with presence in the entire value chain of the power generation business. From fossil fuels it has forayed into generating electricity via hydro, nuclear and renewable energy sources. This foray will play a major role in lowering its carbon footprint by reducing greenhouse gas emissions. To strengthen its core business, the corporation has diversified into the fields of consultancy, power trading, training of power professionals, rural electrification, ash utilisation and coal mining as well.
NTPC was ranked 431st in the ‘2015, Forbes Global 2000’ ranking of the World’s biggest companies.
The total installed capacity of the company is 45,548 MW (including JVs) with 18 coal based and 7 gas based stations. 7 Joint Venture stations are coal based and 8 renewable energy projects. The company has set a target to have an installed power generating capacity of 1,28,000 MW by the year 2032. The capacity will have a diversified fuel mix comprising 56% coal, 16% Gas, 11% Nuclear and 17% Renewable Energy Sources including hydro. By 2032, non fossil fuel based generation capacity shall make up nearly 28% of NTPC’s portfolio.
NTPC has been operating its plants at high efficiency levels. Although the company has 17.73% of the total national capacity, it contributes 25.91% of total power generation due to its focus on high efficiency.
NTPC is not only the foremost power generator; it is also among the great places to work. The company is guided by the “People before Plant Load Factor” mantra which is the template for all its human resource related policies. NTPC has been ranked as “6th Best Company to work for in India” among the Public Sector Undertakings and Large Enterprises for the year 2014, by the Great Places to Work Institute, India Chapter in collaboration with The Economic Times.
Notification details:
Important Dates:
Opening Date of GATE online Application Processing system: 01 September 2015
Closing Date of GATE online Application Processing system: 01 October 2015
Opening Date for Online Application Forms for NTPC: 05 January 2016
Closing Date for Online Application Forms for NTPC: 29 January 2016
NTPC Limited Vacancy Details:
Name of the Post: Executive Trainee
Name of the Discipline:
Electrical
Mechanical
Electronics
Instrumentation
Civil
Computer Science & Information Technology
Eligibility Criteria NTPC Executive Trainee through GATE-2016:
For details on eligibility criteria, click on the link below of detailed advertisement.
Selection Procedure for NTPC Executive Trainee through GATE-2016:
Candidates will be selected on the basis of their performance in GATE-2016 Exam, Group Discussion and Personal interview.
How to Apply for NTPC Executive Trainee through GATE-2016:
Eligible candidates can apply to the post through online along with other necessary documents on or before 29 January 2016. For the detailed advertisement visit www.ntpc.co.in/en/careers
largest energy conglomerate with roots planted way back in 1975 to accelerate power development in India. Since then it has established itself as the dominant power major with presence in the entire value chain of the power generation business. From fossil fuels it has forayed into generating electricity via hydro, nuclear and renewable energy sources. This foray will play a major role in lowering its carbon footprint by reducing greenhouse gas emissions. To strengthen its core business, the corporation has diversified into the fields of consultancy, power trading, training of power professionals, rural electrification, ash utilisation and coal mining as well.
NTPC was ranked 431st in the ‘2015, Forbes Global 2000’ ranking of the World’s biggest companies.
The total installed capacity of the company is 45,548 MW (including JVs) with 18 coal based and 7 gas based stations. 7 Joint Venture stations are coal based and 8 renewable energy projects. The company has set a target to have an installed power generating capacity of 1,28,000 MW by the year 2032. The capacity will have a diversified fuel mix comprising 56% coal, 16% Gas, 11% Nuclear and 17% Renewable Energy Sources including hydro. By 2032, non fossil fuel based generation capacity shall make up nearly 28% of NTPC’s portfolio.
NTPC has been operating its plants at high efficiency levels. Although the company has 17.73% of the total national capacity, it contributes 25.91% of total power generation due to its focus on high efficiency.
NTPC is not only the foremost power generator; it is also among the great places to work. The company is guided by the “People before Plant Load Factor” mantra which is the template for all its human resource related policies. NTPC has been ranked as “6th Best Company to work for in India” among the Public Sector Undertakings and Large Enterprises for the year 2014, by the Great Places to Work Institute, India Chapter in collaboration with The Economic Times.
Notification details:
Important Dates:
Opening Date of GATE online Application Processing system: 01 September 2015
Closing Date of GATE online Application Processing system: 01 October 2015
Opening Date for Online Application Forms for NTPC: 05 January 2016
Closing Date for Online Application Forms for NTPC: 29 January 2016
NTPC Limited Vacancy Details:
Name of the Post: Executive Trainee
Name of the Discipline:
Electrical
Mechanical
Electronics
Instrumentation
Civil
Computer Science & Information Technology
Eligibility Criteria NTPC Executive Trainee through GATE-2016:
For details on eligibility criteria, click on the link below of detailed advertisement.
Selection Procedure for NTPC Executive Trainee through GATE-2016:
Candidates will be selected on the basis of their performance in GATE-2016 Exam, Group Discussion and Personal interview.
How to Apply for NTPC Executive Trainee through GATE-2016:
Eligible candidates can apply to the post through online along with other necessary documents on or before 29 January 2016. For the detailed advertisement visit www.ntpc.co.in/en/careers
No comments:
Post a Comment